Completed Residential Building Projects

  1. Erection of a 2-storey detached house with basement, attic and swimming pool at 10 Namly Hill
    • Designed raft foundation, RC basement wall and RC frame system for the superstructure
  2. Erection of a 2-storey detached house with attic, basement and swimming pool at 37 Oriole Crescent
    • Designed raft foundation, RC basement wall and RC frame system for the superstructure
  3. A&A to existing 2-storey semi-detached house with attic at 824 Dunearn Road
  4. A&A to existing detached house at 11 Camden Park
  5. Erection of a 3-storey detached house with attic and swimming pool at 11C Jalan Arif
    • Adopt raft foundation and RC frame structure
  6. Erection of a 2-storey intermediate terrace house with attic at 38 JalanLeban
    • Adopt shallow footing foundation and RC frame structure system
  7. Erection of a 3-storey intermediate terrace house with attic at 8 Sirat Road
    • Adopt shallow footing foundation and RC frame structure system
  8. Erection of a 3-storey intermediate terrace house with attic at 3 Dix Road
    • Adopt raft foundation and RC frame structure
  9. Erection of a 2-storey semi-detached house with attic and RC flat roof at 70 Frankel Avenue
    • Adopt deep foundation using steel pipe piles and RC frame structure
  10. Erection of a 2-storey intermediate terrace house at 114 Jalan Kuras
    • Adopt raft foundation and RC frame structure
  11. Erection of a 3-storey with roof terrace at 19 Everitt Road North
    • Adopt deep foundation using steel pipe piles and RC frame structure
  12. Reconstruction to existing 2-storey semi-detached house at 35 Kismis Avenue
    • Adopt footings and extensive design checking on the existing structure after partial demolition works
  13. Erection of a 3-storey semi-detached house with attic at 20A Ah Soo Garden
    • Adopt raft foundation and RC frame structure
  14. A&A to existing 2-storey semi-detached house at 23 Grace Park
  15. Erect 2-storey corner terrace house with attic at 69 Jalan Riang
    • Adopt shallow footing foundation and RC frame structure
  16. Reconstruction to existing 2-storey intermediate house at 9 Jalan Siantan
  17. A&A to existing 2-storey terrace house at 11 Jalan Siantan
  18. Erection of a 3-storey corener terrace house with attic at 39 Lorong Pisam Asam
    • Adopt raft foundation and RC frame structure
  19. Reconstruction of an existing 2-storey to a 3-storey intermediate terrace house with attic at 128A Jalan Jurong Kechil
    • Adopt shallow footing foundation, provide independent footing and columns to support the additional storey
    • Adopt soldier pile wall with timber lagging at the rear retaining wall construction with an expose height or depth of 4m
  20. Reconstruction to existing 2-storey corner terrace house at 7A Lorong N Telok Kurau
  21. Existing masonry walls strengthening works using fibre wrap at 127 Stevens Road
  22. Erection of three units of 2-storey intermediate terrace house with attic at 52, 54 and 56 Jalan Leban
    • Adopt raft foundation and RC frame structure
  23. A&A to existing 2-storey intermediate house at 1A Jalan Buroh Perindu
    • Adopt raft foundation for the rear extension and RC frame structure