Completed Infrastructure Project

  1. Proposed box culvert drain and road works at 70 Frankel Avenue
  2. Proposed drain and road works at 39 Lorong Pisang Asam
  3. Proposed external works at 128A Jalan Jurong Kechil
  4. Proposed drain and road works at 50 Robinson Road
  5. Proposed drain and road works at 1, 3, 5 and 5A Duchess Road
  6. Proposed drain and road works at 10 Namly Hill
  7. Proposed drain and road works at 37 Oriole Crescent
  8. Proposed drain and road works at 52, 54 and 56 Jalan Leban
  9. Proposed drain and road works at 11C Jalan Arif
  10. Proposed Water Pipe Diversion for T315 Addition And Alternation Works to Existing Tanah Merah Station And Existing Viaducts (Owner: LTA)
  11. Rehabilitation of Sewerage Systems in Marina Catchment Contract 17- Singapore River Catchment (Tiong Bahru) – P3 C17 by Sam Lain Equipment Services Pte Ltd
  12. Rehabilitation of Sewerage Systems Phase 4 Contract 2 – Serangoon River Catchment – P4 C2 by Sam Lain Equipment Services Pte Ltd
  13. Rehabilitation of Sewerage Network System Phase 4 Contract 5- East Coast Catchment (Bedok Canal)P4 C5 East by Sam Lain Equipment Services Pte Ltd